Project Overview
The Amazon team, the Town of Tonawanda, BL Architecture, and Montante Construction worked collaboratively to deliver this project through design, site plan approvals, permitting, and construction. The facility was designed for 250+ car parking spaces, 250+ oversized van parking spaces, large driveways, and parking for tractor trailer deliveries, six queuing lanes for van loading, and an emergency vehicle by‐pass lane. One of the largest challenges Montante Construction had to solve was figuring out a way to lay out all of the site components around the existing wetlands on the property while providing additional areas for stormwater management. Other challenges included an extremely tight construction timeline, including doing most of the sitework, steel and precast throughout the winter months.
Montante Construction also included a roof-top solar array to offset the facility’s power usage.
-
Location
Tonawanda, NY
-
Industry
Manufacturing
-
Service Type
Design-Build
-
Timeline
9 months
-
Contract Value
$31.5 Million
-
Square Footage
183,125
Talk to us about your project
Montante Construction would love to lead the way in your next build. Get in touch with us here and we’ll get started: